This Work Package includes the following tasks:
Task T1.1 Applicability of the HyperMembrane Design&Construction System.
Task T1.2 Case Study 1: Openair Structure.
Task T1.3 Case Study 2: Building Envelope. Façade.
Task T1.4 Baseline demonstration criteria.
The baseline demonstration criteria will take into account the assessment with regard to:
- Requirements of programmatic use
- Loading requirements for each industrial component
- Regulation involved: Set of blueprints for compliance with local building regulation
- Range of cost of the final product in relation to other existing construction systems.