top of page

0_58

0_58
1/1
Aims
Based on the results of previous “Research for SMEs”all the industrial components necessary to build a
HyperMembrane structure have to be individually slightly re-design to enter market competences.
• Actuators, re-design and implementation for industrial validation.
• Ground connections necessaries to connect the floor rails and structure and to allow the erection and final
positioning of the global structure: re-design and implementation for industrial validation.
• Membrane covering, re-design and implementation for industrial validation.
bottom of page